Mountain bike trail work day on South Shore
The monthly TAMBA trail work day for September will be on the highly respected (and used) Toads/Saxon Creek Trail. The section of trail to be worked on is in the upper portions along the rock gardens. No new alignments will be built, but the technical downhill rock lines will be kept in place, tightened up, armored better and protected from erosion and rear wheel brake dragging.
Because this is about 3 miles from the nearest road every volunteer will need to either ride his/her bike or hike in to the work area.
Plan to start work at 10am and have everyone to the work section by 9:30am on Sept. 24.