THIS IS AN ARCHIVE OF LAKE TAHOE NEWS, WHICH WAS OPERATIONAL FROM 2009-2018. IT IS FREELY AVAILABLE FOR RESEARCH. THE WEBSITE IS NO LONGER UPDATED WITH NEW ARTICLES.

Utility work on Hwy. 28 in Kings Beach resumes


image_pdfimage_print

AT&T resumed utility relocation work Oct. 2 along the north side of Highway 28 between Bear and Fox streets in Kings Beach.

Lane closures in this area can be anticipated. This road work should continue, weather permitting, through the next several weeks.

For more information on the project, go online.

image_pdfimage_print

About author

This article was written by admin