Caltrans wants input on Hwy. 50 bridge
Caltrans has scheduled an open house for May 21 to gather public comments on alternatives for a bridge project on Highway 50 over Echo Summit.
Caltrans is considering five alternatives, including replacing the bridge in one construction season by closing Highway 50 for up to 90 days, replacing it in two seasons with a full highway closure of up to 50 days, replacing the bridge in two seasons with one-way traffic control, or rehabilitating the existing bridge in two seasons with a full highway closure of up to 50 days.
The bridge, which is located seven miles west of South Lake Tahoe, was built in 1938 and is showing signs of wear. The project is currently in the environmental documentation phase.
The meeting will be at the at CCC center in Meyers from 6-8pm.