THIS IS AN ARCHIVE OF LAKE TAHOE NEWS, WHICH WAS OPERATIONAL FROM 2009-2018. IT IS FREELY AVAILABLE FOR RESEARCH. THE WEBSITE IS NO LONGER UPDATED WITH NEW ARTICLES.

Loop road environmental documents released


image_pdfimage_print

By Kathryn Reed

A multi-million dollar transportation project on the South Shore has mushroomed into being a project that could dramatically change the state line area, with repercussions possibly extending beyond the Y.

The loop road would essentially flop how Highway 50 and the southern section of the current loop operate. Even though the same number of lanes would be in use, more land would be paved over. Alternative B includes adding 5.76 acres of asphalt with a roundabout on the eastern end in Nevada or 7.62 acres with a signal at that intersection.

Five alternatives were reviewed in the environmental impact study/environment impact report, with Alternative B the proposed project area. The final document will have the preferred alternative. (One alternative would create eight-lanes of traffic in some areas.)

The EIS/EIR was released Monday night. Tahoe Transportation, the lead agency on the project, hosted an open house April 24 that had many of the same spectators and the same photos and charts from previous gatherings.

The project area extends from a quarter mile southwest of Pioneer Trail in South Lake Tahoe to Lake Parkway in Stateline.

The proposed pedestrian bridge over the realigned Highway 50 near Van Sickle Park. Rendering/Ascent

Alternative B calls for four 11-foot wide travel lanes, 5-foot wide shoulders, and turn pockets at major intersections and driveways. Signals would be added at Heavenly Village Way and what is now the back entrance to Harrah’s.

Six- to 18-foot retaining walls would be built near Van Sickle Bi-State Park. The entrance would be reconfigured and there would be a signal there.

The draft EIR/EIS said noise from the highway will not be a nuisance for park users.

The current highway between Park Avenue and Lake Parkway would be one travel lane in each direction, with landscaped medians, left-turn pockets at major intersections and driveways, and new or upgraded bike lanes.

The EIS/EIR included three areas that were studied for affordable housing that together could accommodate 227 units. One of those sites is where Mike McKeen owns property.

“We will never do affordable housing,” McKeen told Lake Tahoe News. “They offered us incentives to do it, but we don’t want it.”

What he would entertain is condos or a second level of commercial. His land is likely to be the gateway, so to speak, where the new highway would begin on the western edge.

Beyond what was studied in the environmental document, TTD is looking at California Tahoe Conservancy land near the Y for affordable housing.

The agency is legally obligated to relocate the residents and businesses that would be bulldozed to accommodate the realigned highway.

The project started as a way to move the highway out of the casino corridor and turn that area into a city-county street. The new highway would travel behind Harrah’s and MontBleu.

While that is still the plan, all the renderings show a complete-street landscape, with wide bike lanes, and decorative vegetation mixed with the new commercial areas. A footbridge would span the new highway to link the casinos with Van Sickle Bi-State Park.

The belief is millions of dollars would be added to the local economy with more people opting to stop to shop-eat-recreate instead of driving through. Adding more transit options – which includes becoming more walkable and bikeable – the goal is to get people to stay longer

TTD had hoped for federal TIGER (Transportation Investment Generating Economic Recovery) funds to pay for the project. With a new administration in office, it’s not known if that will continue to be a funding source. TTD will be pursuing other avenues.

—–

Notes:

·      The draft EIR/EIS is available online.

·      People have 75 days to comment.

·      The final document is expected to be released in the fall.

image_pdfimage_print

About author

This article was written by admin

Comments

Comments (3)
  1. Irish Wahini says - Posted: April 25, 2017

    I thought about attending the meeting and presentation last night, however, it was not clear which Lake Tahoe Resort Hotel it was being held at! No address in all the published notices! Lake Tahoe Hotel names change names often, and two hotels have a common name: Lake Tahoe Resort and Lake Tahoe Vacation Resort.

    The meeting was held at the Stateline Hotel venue. I asked about parking, as I have a hip injury… And was told parking was $5 or I could go park behind Harrah’s Casino! Sorry – my hip won’t walk that far, and I am not interested in paying $5 to listen to a presentation about my community! Public meetings should be held at locations with available free parking – most locals don’t have spare fivers to throw around. The comment that the attending spectators were the same ones who have attended the previous meetings – probably because they have a business interest that pays their parking expenses!

    Looking at the rendering above, and reading the project plans & costs – I hope this project dies soon. I do not want any part of the Lake Tahoe basin to look like L.A. (Los Angeles). The current entrance to Van Sickle Park would be ruined by concrete everywhere. All this project does is capture pedestrians and steer them into the casino corridors, which is a dying destination anyway. The hotel business will survive with restaurants, shows, shops, concerts, etc. Most of the roadway is in Nevada, so what City do you think will govern the proposed pedestrian street?

    Most folks leave the concrete jungle to visit our mountain town environment…. Let’s not pave it over!

  2. Lou Pierini says - Posted: April 25, 2017

    No money, no eminent domain power = no project! Now a footbridge for the Feldman, Lane sponsered condos. Nice

  3. Robin Smith says - Posted: April 25, 2017

    Have Lane and Feldman been held to account for their part of the ‘HOLE’ deal with City SLT?