THIS IS AN ARCHIVE OF LAKE TAHOE NEWS, WHICH WAS OPERATIONAL FROM 2009-2018. IT IS FREELY AVAILABLE FOR RESEARCH. THE WEBSITE IS NO LONGER UPDATED WITH NEW ARTICLES.

Caltrans to build retaining wall near Emerald Bay


image_pdfimage_print

Repair work to build a retaining wall along a section of Highway 89 in Emerald Bay is set to resume next week.

The retaining wall is being built near the Eagle Point Campground.

Work should be completed by the end of May. The northbound lane of the highway is closed and reversing one-way traffic is being controlled by automated signals.

A new concrete barrier near Eagle Falls was completed as part of the $4.4 million project last fall.

 

image_pdfimage_print

About author

This article was written by admin