THIS IS AN ARCHIVE OF LAKE TAHOE NEWS, WHICH WAS OPERATIONAL FROM 2009-2018. IT IS FREELY AVAILABLE FOR RESEARCH. THE WEBSITE IS NO LONGER UPDATED WITH NEW ARTICLES.

Caltrans working on tunnel near Truckee


image_pdfimage_print

Caltrans will be installing new pedestrian flashing beacons, signs, street lights, pedestrian push buttons lights inside the tunnel and to do shoulder paving on Highway 89 in the “Mousehole” Tunnel area near Truckee starting Sept. 7.

caltransThe construction schedule is:

Sept. 8-Oct. 15 – one-way traffic controls will be in effect 24 hours a day using temporary traffic signals located on each side of the “Mousehole” Tunnel.

This $245,000 project is designed to increase the safety of the traveling public in the “Mousehole” Tunnel area. The general contractor for this project is Koch Excavating Inc. from Penn Valley.

image_pdfimage_print

About author

This article was written by admin