THIS IS AN ARCHIVE OF LAKE TAHOE NEWS, WHICH WAS OPERATIONAL FROM 2009-2018. IT IS FREELY AVAILABLE FOR RESEARCH. THE WEBSITE IS NO LONGER UPDATED WITH NEW ARTICLES.

Hwy. 89-Fanny Bridge realignment to be discussed


image_pdfimage_print

Highway 89-Fanny Bridge will be the focus of a Dec. 4 meeting.

There will be an overview and update on the environmental document, design elements, and next steps for this revitalization project in Tahoe City.

The meeting is being hosted by the Tahoe Transportation District at Granlibakken Resort from 5-6:30pm.

The project intends to improve the safety of vehicle, pedestrian and cyclist mobility at the Tahoe City Y, increase emergency access and egress; resolve structural integrity of 86-year-old Fanny Bridge; assist in alleviating traffic back-ups; and create a vibrant and walkable commercial area.

The design is scheduled to be complete in September 2015. Construction could begin in May 2016.

Specific questions, inquiries and suggestions may be directed to Margaret Skillicorn at suggestions@fannybridge.org or 775.846.2381.

image_pdfimage_print

About author

This article was written by admin